New Braunfels keeps filling in between San Antonio and Austin. New stores open along the frontage roads, warehouses rise on open land, and older buildings downtown get new tenants. Every one of those projects needs a builder who knows how this city reviews plans.
Key Vista Construction has built in South Texas since 2000. Founder Jason Key and our team have delivered more than $170 million in commercial and federal projects. We’ll give you a fixed plan, a real budget and a builder who picks up the phone.
The Comal and Guadalupe rivers are a big reason people love New Braunfels. They also shape what it takes to build here.
Check the flood map first. More than 18 percent of the city sits in the 100-year floodplain, including parts of downtown. Another 12 percent falls in the 500-year floodplain. If your lot is in a flood hazard area, you’ll need a floodplain development permit before you build, and the floor has to sit high enough to meet City rules. We pull the maps before anyone draws a plan.
Plan for a traffic study. New Braunfels requires a Traffic Impact Analysis for any permit that will add traffic. A new store, office or restaurant almost always counts. We order the study early, so your permit isn’t waiting on it.
Know where the aquifer starts. The west side of the city sits on the eastern edge of the Edwards Aquifer. Parts of the recharge zone fall inside the City’s extraterritorial jurisdiction (the land just outside city limits where the City still reviews development). The same aquifer feeds Comal Springs, the largest spring system in Texas. Sites out that way can draw extra water quality review.
Expect several sign-offs. The Building Division routes commercial plans to Planning, Engineering, Fire and the utility providers that serve your site. One gap in the drawings can stall all of them. We send complete sets through the City’s online portal and stay on each reviewer until the permit is issued.
Pad sites along I-35 and FM 306 move fast. We build the shell, the site work and the finish-out, so a new tenant can open on schedule.
New buildings and interior build-outs for professional offices, clinics and service businesses.
Warehouses, flex space and contractor shops built with Capital Steel Industries frames. We supply the building, design it and put it up.
One contract covers design and construction. Your price gets set early, and you deal with one team the whole way.
Older buildings need a careful hand. We update layouts, systems and storefronts while keeping the character people come to see.
Civic facilities built to public bid rules, with the paperwork and inspections those jobs require.
Land along I-35 isn’t getting cheaper, and businesses moving here want to open fast. A pre-engineered metal building gets you under roof sooner than most other options. The frame comes from the factory ready to bolt together, and the clear-span design leaves the whole floor open for racks, trucks or showroom space.
Key Vista is an authorized Capital Steel Industries dealer for South Texas. Each Capital Steel building we deliver carries a 50-year structural warranty.
On a lot near the rivers, we design the slab around the City’s floodplain rules from the start. That saves you from raising the building after the fact.
The city crosses into both Comal and Guadalupe counties, and every side of town builds differently.
Creekside covers about 400 acres at I-35 and FM 306, and new retail and restaurant pads are still going up around it.
Frontage lots heading toward San Marcos and back toward Schertz keep pulling in warehouses, service shops and offices.
Buildings near the Comal River often need floodplain and historic property review before work starts.
Shops, restaurants and event venues in the historic district, where renovations have to fit the setting.
Storage, shops and service buildings along SH 46 and FM 306, with some sites close to the aquifer.
We also serve Garden Ridge, Cibolo, McQueeney and the rest of Comal and Guadalupe counties.
Every New Braunfels project starts on the lot. We look at the flood map, the traffic and the soil before we talk about plans. Then we bring in the architect and engineer, set the budget and handle the permits, including the floodplain permit and traffic study if your site needs them.
Once the City signs off, we run the crews and the inspections, and you get updates without having to chase us down. When the building is done, we walk it with you and hand over every document you need to open the doors.
The City enforces the 2021 International Code Council codes and the 2020 National Electrical Code, in effect since October 2023. New Braunfels plans to adopt the 2027 codes by fall 2027.
If the building will add traffic, yes. That covers most commercial permits. We schedule the study at the start so it runs alongside design.
Often, yes. Sites in a flood hazard area need a floodplain development permit and a floor height that meets City rules. We review the flood maps before design.
Commercial building permits and floodplain permits in New Braunfels expire after 180 days. We time the start so yours stays active.
Yes. We work across New Braunfels in both Comal and Guadalupe counties and the towns around it.
Send us your address and what you have in mind. We’ll look at the flood map and traffic picture for your lot and tell you what it will take to build there. Request your site review or call 210-352-0007.